Rio Brasil Terminal (RBT) is ready to receive larger, higher-capacity container ships following the completion of dredging works on the main channel of the Port of Rio de Janeiro. With an investment of BRL163 million, PortosRio – the port authority of Rio de Janeiro – has increased the minimum…
Dredging works at MHC   Manila Harbor Center (MHC), in cooperation with Prime Metro BMD, recently completed dredging along the quay side to maintain the safe berthing of vessels. Depth alongside the terminal’s 1,035-meter berth has now reached a draft maximum of 10.5-meter MLLW, a development t…